We begin with a full site assessment (soils, topography, vegetation/structures, drainage, utilities, zoning). Then we coordinate planning and design with your architects and engineers. After approvals, we move into site work—clearing, grading, earthmoving, excavation, utility trenching, stormwater systems, and road subgrades—while managing permits, inspections, and client updates through build-ready delivery.
Site prep includes removing vegetation, roots, boulders, or old foundations, then reshaping land to engineered elevations. We balance cut/fill to minimize import/export, grade for proper drainage, and compact in lifts to meet density specs—giving heavy-use zones, roads, and foundations special attention while monitoring slopes, erosion risk, and safe access.
Trenching is controlled excavation for subsurface utilities—water, sewer, electric, storm, and data. We dig to exact depth, slope, and width per plans and code, protect adjacent work, place and inspect lines, then backfill and compact. We coordinate closely with utility providers, engineers, and inspectors to keep schedules and approvals on track.
We use laser/GPS-guided equipment to cut precise slopes and maintain tight tolerances. Our team designs/implements swales and detention/retention features so water flows away from buildings and pavements. Hydrologic analysis, erosion-control planning, and final QC checks ensure finishes meet engineered plans and local code.
Timelines depend on size, complexity, soils, weather, permits, and utility/drainage scope. A small building pad may take weeks; larger or complex sites can take months. We build detailed schedules, include contingencies, and communicate progress so downstream trades can plan confidently.
Key drivers include rock/groundwater/soil stability, site slopes (cut/fill), distances to utility tie-ins, stormwater requirements, erosion control, compaction needs, import/export volumes, access/staging limits, and permit/inspection fees. We present clear assumptions and refine scope as site conditions are verified.
Yes. We assist with permits for grading, stormwater, utility installation, erosion control, and excavation. We coordinate reviewer comments, schedule inspections at critical stages, and maintain documentation to ensure full compliance with engineered plans and jurisdictional requirements.
Safety comes first: trained crews, inspected equipment, site controls, and clear signage/traffic plans. Environmentally, we use silt fences, sediment basins, dust control, limited disturbance, tree preservation where feasible, and managed runoff. Debris is sorted/removed responsibly with recycling when practical.
If we uncover rock, unknown utilities, or high groundwater, we pause, assess, and consult engineers. We propose safe, efficient plan adjustments and communicate cost/schedule impacts. Built-in contingencies help absorb surprises while keeping the broader schedule on track.
We align early with architects, civil engineers, surveyors, utility providers, GCs, and inspectors. Before mobilizing, we review logistics, staging, deliveries, access, and sequences. During work, we schedule around foundations, paving, and landscaping to avoid conflicts and rework.
We warrant that our work meets engineered specifications, local codes, and quality standards. If a grading, compaction, or drainage issue is attributable to our work, we’ll correct it. Project-specific warranty and maintenance terms are outlined in your contract documents.